REAL WORK · PATIENT MONITORING
Mindray patient monitor preventive maintenance
- Problem / need
- Preventive maintenance for PM-8000 Express and ePM 10M monitors.
- Action
- Performed NIBP, ECG, SpO₂ and electrical safety tests.
- Result
- All tests passed.


Preventive maintenance completed
Completed preventive maintenance on Mindray PM-8000 Express and ePM 10M patient monitors. Non-invasive blood pressure (NIBP), electrocardiogram (ECG), oxygen saturation (SpO₂) and electrical safety tests (EST) were performed with test equipment. All tests passed.
These photographs show the equipment during testing.
REAL WORK · INFUSION PUMP REPAIR
Alaris 8100 infusion pump motor replacement
- Problem / need
- Channel error 242.4030 on an Alaris 8100 pump module.
- Action
- Checked the AIL sensor assembly and control board; replaced the faulty motor.
- Result
- Error resolved and all post-repair tests passed.


Tracing the channel error to a faulty motor
The Alaris 8100 pump module displayed channel error 242.4030. Apex checked the Air-in-Line (AIL) sensor assembly and the control board and found both functional. Further troubleshooting identified a faulty motor, which was replaced.
The error resolved after motor replacement, and all post-repair tests passed. The photographs document the mechanism and control board during the service work.
REAL WORK · INFUSION SYSTEM REPAIR
Alaris 8015 control board replacement
- Problem / need
- The Alaris 8015 battery test did not pass.
- Action
- Diagnosed a faulty control board and replaced it.
- Result
- Battery test passed after control board replacement.


Resolving a failed battery test
The Alaris 8015 was not passing its battery test. Apex diagnosed a faulty control board and replaced it. The battery test passed after the replacement.
These photographs show the opened housing and control board during the service work.
REAL WORK · SUCTION SYSTEMS
Zimmer Biomet suction unit: power entry module replacement
- Problem / need
- A faulty power entry module on a Zimmer Biomet suction unit.
- Action
- Replaced the power entry module assembly.
- Result
- Power entry module replacement completed.


Corrective service at the mains power inlet
The power entry module on this Zimmer Biomet suction unit was faulty and was replaced. The service concerned the module at the unit's mains power connection.
The photographs document the power entry module and its wiring during service. They provide a closer view of the component involved in the repair.
REAL WORK · PATIENT BEDS
Patient Bed: Power Entry Module Replacement
- Problem / need
- Burned power entry module on a patient bed.
- Action
- Replaced the burned module.
- Result
- Service completed; all post-service tests passed.


Burned module replaced
The patient bed had a burned power entry module. The module was replaced, and the photographs document the component and terminal wiring during service.
REAL WORK · PATIENT MONITORING
Central Monitoring Communication Repair
- Problem / need
- One bed was not communicating with the Mindray central system.
- Action
- Troubleshot and performed corrective service.
- Result
- Communication with the affected bed was restored.

Restoring communication with one bed
One bed was not communicating correctly with the Mindray central monitoring system. Troubleshooting and corrective service resolved the issue, restoring communication with the affected bed.
Technical context
Central monitoring systems bring together information from connected bedside monitors and telemetry transmitters for viewing at a central workstation. Mindray describes this workflow in its central monitoring system overview. This is general system context; the work documented here concerns one bed’s communication issue.
REAL WORK · ULTRASOUND
Mindray TE7 Ultrasound System: Keyboard Cable Repair
- Problem / need
- Damaged, severed keyboard cable on a Mindray TE7.
- Action
- Repaired the cable; documented the cable and diagnostic display.
- Result
- Repair completed; all post-repair tests passed.


Damaged keyboard cable repaired
The keyboard cable on this Mindray TE7 ultrasound system was damaged and severed. The cable was repaired. The photographs document the damaged cable and a system diagnostic display.
REAL WORK · SURGICAL TABLES
Surgical Table Hand-Control Cable Repair
- Problem / need
- Damaged surgical-table hand-control cable.
- Action
- Repaired the damaged cable.
- Result
- Repair completed; all post-repair tests passed.

Hand-control cable repair
The cable on this surgical-table hand control was damaged. The damaged cable was repaired. The photograph shows the hand pendant associated with the service work.
REAL WORK · SURGICAL EQUIPMENT
MicroAire Liposuction System: Internal Connection Repair
- Problem / need
- Disconnected connector pin in a MicroAire liposuction system.
- Action
- Corrected the connector-pin issue.
- Result
- Connection issue corrected; all post-repair tests passed.

Connector-pin issue corrected
One connector pin had become disconnected in this MicroAire liposuction system. The connector-pin issue was corrected. The photograph shows the internal connector and wiring.
REAL WORK · DIAGNOSTIC EQUIPMENT
Otoscope Lamp Replacement
- Problem / need
- Otoscope lamp replacement.
- Action
- Replaced the lamp.
- Result
- Service completed; all post-service tests passed.

Lamp replacement completed
The otoscope lamp was replaced. The photograph documents the lamp during the service work.
REAL WORK · ANESTHESIA MAINTENANCE
Mindray A3/A5 preventive maintenance
- Problem / need
- Scheduled preventive maintenance for Mindray A3/A5 anesthesia equipment.
- Action
- Completed preventive maintenance using the PM kit.
- Result
- Preventive maintenance completed; all post-maintenance tests passed.

The components behind preventive maintenance
This photograph shows the PM kit for the Mindray A3/A5 anesthesia machine series. The individually packaged components are arranged for a clear view of the kit.
REAL WORK · SURGICAL TABLE SERVICE
Amsco 3085 SP surgical table panel troubleshooting
- Problem / need
- Table would not move up or down; column panel was displaced and jammed.
- Action
- Corrected the displaced, jammed panel and restored table movement.
- Result
- Repair completed; all post-repair tests passed.


Panel interference and vertical movement
The reported issue was that the Amsco 3085 SP surgical table would not move up or down. A column panel had shifted out of position and become jammed, interfering with vertical movement. These photographs document the panel condition and the table column during troubleshooting.
REAL WORK · DEFIBRILLATOR SERVICE
LIFEPAK 20 printer replacement
- Problem / need
- LIFEPAK 20 printer was not operating.
- Action
- Replaced the printer assembly.
- Result
- Replacement completed; all post-service tests passed.


Reported issue and work performed
The printer was not operating. The printer assembly was replaced as part of corrective maintenance on the LIFEPAK 20. These photographs document the assembly and connections during the work.
REAL WORK · ULTRASOUND MAINTENANCE
Hitachi Aloka ProSound F37 preventive maintenance
- Problem / need
- Preventive maintenance for a Hitachi Aloka ProSound F37.
- Action
- Replaced the battery and cleaned the interior.
- Result
- Maintenance completed; all post-maintenance tests passed.

Battery replacement and internal cleaning
Preventive maintenance on this Hitachi Aloka ProSound F37 ultrasound system included replacing the battery and cleaning the interior. The photograph shows access to the system during that work.
For an ultrasound maintenance request, share the manufacturer, model, reported concerns and facility location so the service scope can be reviewed.
REAL WORK · LABORATORY COLD STORAGE
Laboratory freezer filter cleaning and switch service
- Problem / need
- Freezer was not reaching the requested temperature.
- Action
- Cleaned dirty air filters and reinstalled a displaced switch.
- Result
- Service completed; cooling performance checks and post-service tests passed.



Cleaning the filters and reinstalling the switch
The reported concern was that the freezer was not reaching its requested cooling temperature. The lower compartment was opened, dirty air filters were cleaned, and a switch that had come out of its mounting position was reinstalled.
These photographs document access, cleaning and the switch condition during the service work.
REAL WORK · PATIENT BEDS
Patient bed wheel and mechanical assembly repair
- Problem / need
- Damage to the bed wheel assembly and associated mechanical components.
- Action
- Completed repair work on the wheel and associated bed mechanism.
- Result
- Wheel and mechanical repair completed.


Service to the bed's wheel and base components
This patient-bed service project involved repair of the wheel assembly and associated mechanical components. The work addressed the bed's wheel and base mechanisms.
The photographs show wheel and hub components documented during the service work, providing a closer view of the mechanical assemblies involved.
REAL WORK · STERILIZATION EQUIPMENT
STERIS V-PRO 60 vacuum pump oil change
- Problem / need
- Vacuum pump oil maintenance on a STERIS V-PRO 60 sterilizer.
- Action
- Drained and replaced the vacuum pump oil.
- Result
- Vacuum pump oil change completed.


Vacuum pump oil service
A vacuum pump oil change was completed on this STERIS V-PRO 60 sterilizer. The service photographs show access to the pump compartment and the oil-draining arrangement used during maintenance.
Used pump oil was collected through a drain hose into a container as part of the oil-change procedure. The photographs document the maintenance work with the equipment's service panels open.
REAL WORK · SURGICAL LIGHTING
Amico surgical light drift correction
- Problem / need
- The surgical light gradually drifted downward instead of holding its selected position.
- Action
- Performed corrective maintenance to address unwanted downward movement.
- Result
- Stable positioning of the lighthead restored.


Restoring the lighthead's ability to hold position
Corrective maintenance was performed on an Amico surgical light that gradually drifted downward instead of holding its selected position. The issue was resolved, restoring stable positioning of the lighthead.
The photographs show the lightheads and articulated suspension arms associated with the service project. The reported concern involved maintaining the light's position after adjustment.
REAL WORK · SURGICAL TABLES
STERIS surgical table battery replacement
- Problem / need
- Battery replacement required on a STERIS surgical table.
- Action
- Replaced the surgical table battery.
- Result
- Battery replacement completed.

Battery service within the table base
The battery was replaced on this STERIS surgical table. The photograph documents the table with the base covers removed, providing access to the battery compartment and internal assemblies during service.
This project records battery replacement as a distinct surgical-table service task. The open-base view shows the equipment configuration at the time of the work.
REAL WORK · ENDOSCOPE REPROCESSING
Medivators air valve replacement for a No Air Flow alarm
- Problem / need
- The Medivators endoscope reprocessor displayed a No Air Flow alarm.
- Action
- Replaced the air valve associated with the reported fault.
- Result
- Air valve replacement completed to address the No Air Flow alarm.




Corrective service to the air valve assembly
An air valve was replaced in this Medivators endoscope reprocessor following a No Air Flow alarm. The service involved the valve assembly shown in the close-up photographs.
The images document the removed assembly, the diaphragm face and pneumatic connections, and the surrounding internal components. They provide a record of the component replaced during troubleshooting of the reported airflow fault.
REAL WORK · ENDOSCOPE REPROCESSING
Medivators water filter replacement
- Problem / need
- Water filter replacement on a Medivators endoscope reprocessing system.
- Action
- Removed the used filter cartridge and installed a replacement.
- Result
- Filter replacement completed.

Replacement of the filter cartridge
The water filter cartridge serving this Medivators endoscope reprocessing system was replaced. The photograph shows the used cartridge alongside the replacement cartridge, with the filter housing visible beside them.
The side-by-side view records the visible condition of the removed filter and the cartridge used for the maintenance task. This service example documents filter replacement separately from the Medivators air-valve repair.
REAL WORK · SUCTION SYSTEMS
MEDCO Aspirator IV preventive maintenance
- Problem / need
- Preventive maintenance for a MEDCO Aspirator IV suction unit.
- Action
- Performed preventive maintenance on the aspirator.
- Result
- Preventive maintenance completed.

Preventive maintenance of the suction unit
Preventive maintenance was performed on this MEDCO Aspirator IV suction unit. The photograph documents the aspirator associated with the maintenance visit, including its collection canister, vacuum gauge, tubing and front-panel controls.
This case is part of Apex's suction-equipment service work. For a maintenance request, provide the equipment model, facility location and the number of units so the scope can be reviewed.
REAL WORK · ANESTHESIA EQUIPMENT
Anesthesia machine oxygen sensor replacement
- Problem / need
- Oxygen sensor replacement required on an anesthesia machine.
- Action
- Replaced the anesthesia machine's O₂ sensor.
- Result
- Oxygen sensor replacement completed.

Replacement of the O₂ sensor
The oxygen (O₂) sensor was replaced on an anesthesia machine. The close-up photograph documents the sensor associated with this service task, including its label and electrical connector.
This case records a specific component replacement within anesthesia-equipment service. The component image provides a clear view of the sensor involved in the work.
REAL WORK · ANESTHESIA EQUIPMENT
GE anesthesia machine preventive maintenance
- Problem / need
- Preventive maintenance for a GE anesthesia machine.
- Action
- Performed preventive maintenance with access to the breathing system.
- Result
- Preventive maintenance completed.

Breathing-system access during preventive maintenance
Preventive maintenance was performed on this GE anesthesia machine. The service photograph shows the breathing-system compartment open, with its internal assemblies accessible during the maintenance work.
The image documents the breathing-system components and connected oxygen sensor at the time of service. This is a separate preventive-maintenance case from the oxygen-sensor replacement shown elsewhere in this portfolio.
REAL WORK · STERILIZATION EQUIPMENT
Getinge sterilizer boiler pressure switch replacement
- Problem / need
- A HEAT-UP alarm on a Getinge steam sterilizer.
- Action
- Replaced the boiler pressure switch associated with the heating fault.
- Result
- Pressure switch replacement completed to address the HEAT-UP alarm.



Corrective service to the boiler pressure control
The boiler pressure switch was replaced on this Getinge steam sterilizer following a HEAT-UP alarm. The circled component in the service photograph identifies the pressure control involved in the replacement.
The accompanying photographs document the electric boiler's pressure-control arrangement and the sterilizer's piping, valves and pressure gauge. Together, they show the component replaced and the surrounding equipment during corrective service.
REAL WORK · WARMING EQUIPMENT
Blanket warmer motor replacement
- Problem / need
- Motor service on a MAC Medical DWC243074T-4B blanket warmer.
- Action
- Replaced the motor.
- Result
- Replacement completed; all post-service tests passed.

CORRECTIVE MAINTENANCE
A closer look at the motor assembly
This blanket warmer service project involved replacing the motor. The close-up photograph shows the motor assembly, mounting hardware and surrounding components.
For a blanket warmer repair request, share the manufacturer, model, reported issue and facility location. These details help Apex review the equipment and define the appropriate service scope.
REAL WORK · ANESTHESIA EQUIPMENT
Anesthesia machine service, up close.
- Problem / need
- Anesthesia breathing-system service and flow-sensor calibration.
- Action
- Completed breathing-system service and flow-sensor calibration.
- Result
- Service and calibration completed; all post-service tests passed.

THE DETAILS BEHIND THE WORK
From the breathing assembly to the calibration screen
Real service work often happens around the components that sit below the main display. This photo series brings those details into view: the absorber assembly, bellows and housing, pressure controls, tubing connections and a Mindray A3 flow-sensor calibration screen.
The photographs capture different equipment views and stages of work, giving healthcare teams a closer look at the systems involved in anesthesia equipment support.
01 · BREATHING SYSTEM
Looking closely at the assembly
The breathing-system photographs show the absorber canister below the assembly and the tubing connections around it. Above the assembly, the pressure gauge, transparent valve covers, APL control and Auto/Manual selector are visible.
These views help identify the equipment configuration and the components involved in a service request. Clear photographs of the complete assembly and individual connections can also make discussions about parts, accessories and reported concerns more specific.


02 · COMPONENT ACCESS
The bellows and its housing
One photograph shows the bellows held outside the transparent housing. Another shows the housing on the breathing assembly with the bellows removed. Together, these close views document component access around the breathing system.
The surrounding controls and connections remain visible, adding useful context to the individual component photograph.
03 · MINDRAY A3
Flow-sensor calibration in progress
The Mindray A3 photograph captures the machine in Standby with its built-in flow-sensor calibration routine running. The on-screen progress indicator records that stage of the work.
Mindray includes flow-sensor calibration in the A3/A5 operating instructions. The applicable instructions depend on the equipment model and software revision; technical work should follow the documentation for the specific unit.
Technical reference: Mindray operator manuals — A3/A5.

ANESTHESIA EQUIPMENT SUPPORT
Tell us what your equipment needs.
Apex Biomedical Technology is based in Houston and welcomes service requests from healthcare facilities across the United States. Share the manufacturer, model, reported issue and facility location so the requested scope and next steps can be reviewed.
For a multi-unit request, identify each machine separately and match the photographs or reported concerns to the relevant device.
In the field
Inside the work
View the field-work gallery
See the original Stryker, anesthesia, ultrasound and infusion service photos together on our homepage.
View real-work photos →